Sandstein was founded in March 1998 and located in Taiyuan city,Shanxi Province.
Sandstein has established the complete quality control systems and certified by ISO9001:2000 and got the product conformity certificate by BV For ISO2531,EN545,EN598,EN124 and EN1092.and we’re prepare to get the approval for C40 certificate.
Head office: 19th Floor,Site A,King Office Building,
. NO.9 FuXi Street,taiyuan,Shanxi,China
Branch: Sandstein Mintmetal Industries Co.,Ltd
. Sandstein Aijiu Foundry Co.,Ltd
. Sandstein I/E(shanghai) Co.,Ltd
. NO.9 FuXi Street,taiyuan,Shanxi,China
Branch: Sandstein Mintmetal Industries Co.,Ltd
. Sandstein Aijiu Foundry Co.,Ltd
. Sandstein I/E(shanghai) Co.,Ltd
Tel: 0086 351 4131515/16/17/18/19
Fax: 0086 351 4121515
Email: info@sandstein.com.cn
. admin@sandstein.net.cn
Website: www.sandstein.com.cn
Fax: 0086 351 4121515
Email: info@sandstein.com.cn
. admin@sandstein.net.cn
Website: www.sandstein.com.cn




India Cuddalore 2*660MW Coal-fired Power Station, 10478tons
Pakistan Kasim 2x660MW Coal Fired Plant Project, 28000tons
3644tons for 2*660MW Oil-fired Power Station, Saudi Arabia
American CCC Steel Frame Project
India Adani 5*660MW Supercritical Unit for APL Power Station 32000tons
For French Energy Power, 1200tons Brazil PAMPA 1# Boiler Project
For Vale of Brazil, 3000tons Structure for Takraf Project in Germany
FRANCE ALSTOM, 3672 tons Egypt GIZA Gas Turbine Power Plant
GE, Angola 9E Combustion Engine Waste Heat Boiler Structure, 400tons
SIEMENS 1025 tons Braden Egypt Contract
Brazil PAMPA SUL 1*345MW Power Plant Set Project
Slovakia MSS Bridge Fabrication Machine Project
Vietnam Formosa Ha Tinh No.1 & No.2 Blast Furnace Project, 7700tons
Morocco Jerada l x350MW Coal Fired Plant, 9400tons
Nacala& Motize,8000tons